Bracebridge residents and visitors are advised that, in accordance with the Land Use Permit from the Ministry of Natural Resources and Forestry, the Muskoka River will be closed to navigation at Lot 3, Concession 13, Muskoka Township from November 23, 2021 through to April 1, 2022.
This is a result of the installation of a floating snowmobile bridge.